I am a little early posting this considering the linky doesn't start until Sunday, but to me, the third quarter started on the 1st. If you haven't checked out the Finish-a-Long going on at Quilter in the Gap, do so now.
My goals are pretty much the same since I only got one project done last quarter. My mission is to change that this time and actually finish all of these. I must resist the allure of new projects a little more.
1. Garter stitch scarf.
2. Sewing machine cover.
3. Late (very very late) wedding present.
4. Drunkard's Path quilt.
5. Line Break shawl.
6. Piper's Journey shawl.
I will at least have the last two done for this. My DP quilt is the biggie for me and then I can concentrate on the other large quilts in progress I have already.
Be back after work with my WIP post.
1 comment:
Good luck with everything Katie! I love the colors of your DP project!
Post a Comment