Showing posts with label cross stitch. Show all posts
Showing posts with label cross stitch. Show all posts

Monday, September 2, 2013

Projects Goals: September

I'm a day late posting this and have an overnight guest coming shortly, so this will be quick and to the point.

To start off, I want to recap how I did with my goals for August. For sure, I am still trying to do to much, but this really doesn't bother me as I just keep creating. That's really what matters.

Goals Met:

1. Alluvia - finished within a week. I will be posting about my Camp Loopy projects this month as a recap.

Alluvia Tote

2. Altocumulus - I did finished the knitting but still have to block it.

Knitting to Block

3. Dessert of the Month - I easily got through June and am starting on August.

Dessert of the Month WIP

4. Garden Tote - it's actually embarrassing how little time it took to finish the embroidery on this. I was pretty mad at myself the day I finished it because I was letting a little thing stall this project. In addition to finishing the stitching, I also have cut out all the tote bag pieces.

Garden Tote WIP

5. East Gable Shawl - finished but not blocked yet.

Goals Not Met:

1. Irene Adler - I didn't start and am probably going to put this one off for awhile. I have another large lace weight shawl on my needles and can't work on two at the same time.

2. Ennoble - I didn't start it.

3. Allis - another I didn't start.

4. Moulin Rouge - ditto.

5. Ranrike - no progress.

6. Driftwood - no progress.

7. Sugar Block Club - no progress.

8. Forest QAL - I didn't make anything for the link up as I couldn't decide on a small project. I really just have my heart set on my original quilt and will be working on that.

9. Road to Round Rock quilt - no progress.

10. Handstitched Mini - no progress.

11. Art quilt - no progress.

12. Dog dish mat - I decided that this project is just not going to happen. It's one of those things that sounds good in theory, but I don't love the idea of it in my reality.

13. Honeycomb mini - no progress.

Now onto my goals for September.

1. Dreambird - get through four of the six skeins of the gradient.

2. Southern Skies - this is a three skein shawl that I want to finish by the end of October. This month, I would like to finish one skein.

3. Camptown Races - I want to start and finish this cowl.

4. Allis - I want to start and finish.

5. Ranrike - finish edging.

6. Driftwood - finish one of two skeins.

7. Ennoble - start and finish.

8. Sugar Block Club - catch up.

9. Road to Round Rock - finish top.

10. Handstitched mini - finish two blocks.

11. Garden Tote - finish.

12. Forest Quilt - finish four blocks.

13. Art Quilt - start.

14. Woodland Sampler - finish frames.

15. Christmas Ornaments - finish one.

16. Dessert of the Month - finish.

What do you have planned for September?

Saturday, August 17, 2013

Project Setbacks

While it happens from time to time, I don't usually post about project failures. This one is a bit different for me because of all the time I have spend working on it so far. Many projects that I have to start over or readjust are in early stages.

If you have been following my (few, lately) posts, you may have noticed I have switched cross stitch projects. I'm now working on the Dessert of the Month pattern instead of the Woodland Sampler. I wasn't planning on this but got to a point where I have to start over with the Woodland Sampler.

Woodland Sampler WIP

Yep. Completely fresh. That means many stitches to cut out if I want to reuse the linen I have been stitching on, or just start fresh with a different base fabric. The latter option came to light when I realized how much I will have left of the base fabric I'm using for the Desserts. If it works, I will just stitch Woodland on new fabric and probably throw the other away. That's how pissed I am about it (no fault of the pattern designers though!).

Ok, so now that I have rambled on, shall I show you why this project has to be started over?

Woodland Sampler WIP

You can see where my stitches will end up; right at the edge of the linen. It's a little close for comfort, but could have worked if it wasn't for the fabric being cut at an angle. This is sort of visible on the righthand side of the photo, but it gets worse. The top line of green thread is where I feel comfortable with the margins.

I spent time marking out the space the design would take and it would be tight if I still used this linen.

Woodland Sampler WIP

How about some beauty shots of my progress on it?

Woodland Sampler WIP

Woodland Sampler WIP

Woodland Sampler WIP

Woodland Sampler WIP

On a positive note, I am happily stitching away on the Desserts. I am glad to have a different project to work on so I can have some time away from my frustation. I'm hoping to pick the Woodland Sampler up again in September, fresh and ready to finish before the end of the year!

Have you ever needed some time away from a frustrating project?

Thursday, August 1, 2013

To Do First: August

After taking a couple months off of posting a to-do list, I am back with a more defined version. July was a very introspective month for me, and one of the things I determined was that I needed concrete goals. It's all good that I list projects to focus on, but it can be a bit overwhelming if I go into the month with the mindset to finish all of them. It's obvious by now that I don't make short lists.

I do have a bit to catch up on with posting. Once the routine is gone, it's hard for me to get back. But I have photos that need words and drafts written that need photos. Of course, those items don't align with each other. I also have enough FOs to last me at least a month, if I posted one a day. I haven't decided how to tackle them as far as sharing, but by the end of the year I will be current.

So without further rambling, I present my goals for this month.

1. Alluvia - this is a felted tote that I'm knitting for the last project of Camp Loopy. This is the only must finish this month.

Alluvia WIP

2. Irene Adler - a large lace-weight shawl that I just want to start.

3. Altocumulus - a worsted-weight shawl that I would like to finish. I have a good start already.

Altocumulus WIP

4. Ennoble - a beaded scarf that I would like to start and finish.

5. Allis - another shawl that I want to start. It's for a KAL that doesn't start until mid-month.

6. Moulin Rouge - a single skein shawl that I want to start and finish.

7. Ranrike - a shawl I started last year. I want to get about halfway, which would be finishing the border.

8. Driftwood - another shawl that I started last year. I would also like to get halfway with this one, which means finishing up one of two skeins.

9. Sugar Block Club - I have blocks done through March and would like to catch up.

10. Forest QAL - my original plan for the link up will not get finished. I will still be sewing it up, but want to finish a smaller project to submit.

11. Road to Round Rock - I have some of the blocks done on this one. I would like to finish them.

12. Handstitched mini - another project from last year. I have one block done and want to finish two more.

13. Art quilt - I just want to start so I can see my vision come to life.

14. Dog dish mat - a short project that I just keep putting off. I want to start and finish it this month.

15. Honeycomb mini - I would like to finish the top and transfer the embroidery design.

16. Dessert of the Month - this is my new lunchtime project. I finished January over a few days in July and would like to get through June.

DotM WIP

17. Garden tote - I want to finally finish the embroidery.

18. East Gable Shawl - I'm about halfway and would like to finish.

East Gable Shawl WIP

What do you have planned for the month of August?

Saturday, June 1, 2013

To Do First: June

I'm back! Now that my obsession that is Mad May is over, I want to spend more time in this space. Not only do I have lots of projects to blog about, I have even more planned for the future. To start off, I'm going to share my list for this month. June is going to be mostly about finishing up WIPs and to make this short, I will only list those projects that I'm going to concentrate on the most.

Knitting:

1. Language of Roses - Camp Loopy has started as of today and this going to be my first project. We are to make a single skein (lace or fingering weight) project that has to be at least 375 yards. The only catch is the yarn base has to be one you've never used. I'm knitting this with Madelinetosh Prairie in the Afternoon colorway. I've already completed the first chart and hope to make it through the second over the weekend.

Language of Roses WIP

2. Pull Me Over - a sweater I started in May. I didn't make much progress but this one should be a quick finish once I get back to it.

3. Love Letters - this is my first pair of socks. I have one done and have the cuff of the second done. Another one that should fly once I start it again.

4. Temptress - a laceweight shawl with beads that was a mystery KAL from earlier this year.

5. Sourwood Mountain - mitts that I started last year (!) and really want to crank out. This is on my FAL list for this quarter as well.

6. Ranrike - my oldest knit WIP and one that I would love to get off the books.

7. Gemini - another sweater, this one started in April. I'm almost to the sleeve split and I think this should be quick to finish as well.

8. Driftwood - a shawl from last year that is also on my FAL list.

9. Hitchhiker - another WIP from Mad May. This was my project for lunch breaks at work and may continue to be so.

Sewing:

1. Road to Round Rock quilt - my goal is to finish the top this month. It will be wonderful to get back to sewing this month.

2. Art quilt - this one has been in my sketchbook from the beginning of the year. I want to keep it under wraps until I start experimenting but will share my progress as I go along.

3. Handstitched mini - another FAL project.

4. Sugar Block Club - I'm behind on the monthly blocks but should be able to crank these out quickly.

5. Forest QAL - I really want to submit my intended project to the link up. Sewing one or two of these blocks a week should get me there.

6. Notebook cover - this involves turning a piece of embroidery into a sewn item.

Embroidery:

1. Woodland Sampler - I have April to finish as well as May and June to start.

2. Garden Tote - once I finish the embroidery this can move to the sewing list.

3. Nesting Place - an old WIP that deserves to be finished (also a FAL project).

4. Dessert of the Month - last's years monthly cross stitch from The Frosted Pumpkin that I haven't started yet.

I also need to organize my studio space this month and have some other art ideas that are screaming to become reality.

Tomorrow I will share a little bit about the craziness that was Mad May for me. See you then!

Thursday, April 18, 2013

WIP Wednesday and a UFO Plan

I realized it's been a few weeks since I posted about my WIPs. I only have a couple to share as the other things I've been working on are finished. However, it is still snowing here so FO photos are going to be delayed.

I've made a little progress on my Woodland Sampler.

April WIP

My most exciting WIP is this sock. It's my first ever and was easier than I thought it would be. Just a lesson in following the pattern and working each stitch as I come to them. I'm taking a hiatis from casting on the second sock to finish up a couple other things but should have it done by the end of the month.

One Finished Sock

Over this upcoming weekend my goal is to catalog all of my UFOs (WIPs are included). Judy of Patchwork Times is hosting a UFO Parade through the end of the year. It's a goal of mine (and many others it seems) to cut down on the number of projects in limbo. I've been setting rules for myself, like having to finish two projects in order to start a new one. That hasn't worked longer than the first finish.

So I've been wondering to myself why I don't finish everything I start. And how can I change that? I spent some time at the end of last year throwing some UFOs into my scrap bin for use in other projects. With those fabric based projects, it was simply that I fell out of love with the idea. It was easy to move on. The ones I have more trouble with is my knitting projects. I still love all of the unfinished projects. I just only have the two hands so I can only work on one at a time.

All of this boils down to my ideas. When I am on a roll with ideas, it just spurts out, usually to the point of being out of control. I also think I have more time to do things than I actually do, so there is that factor of not taking into account reality. I desperately need a plan. Some way to have my cake and eat it too. My life is full with work, Chad, friends, my dogs, taking care of a home, and the other activities I enjoy outside of creating with fabric and yarn. Sometimes there is a lack of balance.

While I don't have a complete plan, I know I need to focus, find balance, and follow through. An ambitious goal would be to end 2013 with no unfinished projects. I'm not sticking to that (yet). We'll see once I list all of those lingering items.

How about you? Do you have a plan to finish your UFOs? Or, do you not have any at all? (If so, please share your tips for keeping them under control.)

Monday, April 1, 2013

To Do First: April

Seriously, how is it April already? On one hand, time is moving way too fast and on the other, I am happy to see March gone. It's my least favorite month and historically a difficult one for me.

Before getting to my lists, I have to admit my goal of fitting sewing in every day wasn't met. I started experiencing severe back pain a little over a week ago and with no cause or solution for it, kneeling on the floor to cut or lay out fabrics isn't in the cards. Hopefully this will pass and I can get back to working on all of my projects.

First, my March recap.

Knitting:

1. Joji Mystery - still haven't started.
2. The Sermon - didn't touch.
3. New Beginnings - didn't touch.
4. Cora - stuck on the damn sleeves.
5. Itasca - didn't touch.
6. Mystery Sock - didn't start.
7. Driftwood - didn't touch.
8. May Day Shawl - finished. Will post more about it in April.
9. Madison - finished. Another one I will post about in April.
10. Boo Knits Mystery - didn't touch.
11. Sourwood Mountain - didn't touch.
12. Olympic National Park - finished. Yet another post to come.
13. Canyonlands - started on Saturday and have the rest of the edging to finish.
14. Cowboy Cowl - didn't start.
15. Abalone - didn't start.
16. Age of Brass and Steam - didn't start.
17. 28's Big Sister 77 - didn't start.
18. Business Casual - didn't start.
19. Tank top test - I have started and have to finish by April 15th. I can't share any photos until after then either.
20. East Gable Shawl - started.

March Knitting FOs

Sewing:

1. Project Quilting - well, I skipped one challenge because I didn't feel it posed a challenge and didn't get back into the rest. The season is over so this will come off my list.
2. Row QAL - didn't start.
3. Handstitched mini - haven't touched.
4. Kaleidoscope back - didn't start.
5. Baste and quilt Drunkard's Path - didn't do. Will explain more in my FAL post.
6. Emerald Challenge - started but didn't finish in time for the challenge deadline. In other words, it still isn't done.
7. Sugar Block Club - caught up.
8. Weekender - didn't start.
9. Low Volume top - didn't start.
10. Dogwood Blossom - didn't start.
11. Honeycomb SAL - I changed my mind on fabrics and haven't started.
12. Road to Round Rock QAL - I've started but my back issues have stalled me.
13. Dog dish mat - didn't start.
14. Curved tree mini - didn't start.
15. Zig Zag top - didn't start.

Sugar Block Club: January-March

Embroidery:

1. Nesting Place - didn't touch.
2. Garden Tote - didn't touch.
3. Dessert of the Month - didn't start.
4. Gorey SAL - the SAL for this one is over so I'm taking it off. I do like the idea of stitching one of Gorey's illustrations so it may make its way back here.
5. White on White - didn't start.
6. Woodland Sampler - caught up.
7. Reindeer banner - didn't start.
8. Sampler from school - didn't touch.
9. Cloth from EEC class - didn't touch.

Woodland Sampler WIP

Now for April. I'm not adding too many new things as I'm really trying to finish up WIPs first.

Knitting:

1. Patina socks - the March club package from Tanis Fiber Arts
2. Juego - a MKAL on Ravelry.
3. Love Letters socks - another KAL on Ravelry.
4. Pooling Socks Challenge - hosted by Judy.
5. Second Quarter Challenge - for The Loopy Ewe. It hasn't been announced as of yet so I'm not sure what I will be knitting up.

Sewing:

1. Forest QAL - I posted about this earlier this month.
2. Quilted Block Holder - as seen here. I love the idea of having something pretty to rangle those rouge blocks.

Nothing new in the embroidery category.

What do you have on your to do list for April?

Thursday, March 21, 2013

WIP Update

I hear it's spring but you wouldn't know it looking outside. To top it off, there was an announcement today that we should expect major flooding once the snow melts and the ground thaws. Oy.

Spring?

As for my update, I really only have one project with any significant progress. That would be my Woodland Sampler. This past week I have found myself wanting to work on at home instead of solely at work. I should be all caught up come April 1st.

Woodland Sampler Progress

I hope spring is treating you nicely so far. See you soon!

Thursday, February 21, 2013

WIP Update

I've been working diligently away on my projects, so much that finding online time has been challenging. Despite that, I'm only sharing progress on two of them today. They have been my main focus in different settings: the cross stitch continues to be my work project and the sweater is a test knit. It's due date is in a week and a half, so I have to get cracking on it. Completely doable but most other projects have taken a back seat the past few days.

Woodland Sampler WIP
 
Madison WIP

I hope to have some time to take photos of my pile of FOs soon. I should be back this weekend with another post. Have a great rest of the week!

Wednesday, February 6, 2013

WIP Wednesday

This is going to be a short one. I haven't been able to work on too much this past week as I have been busy with work and housework, and also re-evaluating some things. I take on way too much all the time and I finally have hit the place where this needs to change. So, expect few projects in progress at one time and hopefully, more finished items. Let's just not talk about the pile of things I have waiting to photograph properly.

My projects this week are the Denise shawl, my Cora sweater (half a sleeve is done!), my Woodland Sampler, and some fabrics I pulled for the Project Quilting challenge due Sunday. I am not a pleased with the black and white prints here but find I am lacking in those in my stash. This is going to be a Make It Work moment for me.

WIPs

I was tempted to start a new project. I just wanted something quick to knit up so I was going to work on a hat. I have the yarn and pattern, I just can't find the right size needle. I know I have them but they are not where they should be. I'm taking this as a sign I need to stick with my resolution to only start a new item after finishing two.

Posting for me may be sparse as I solidify the changes I am working towards and also concentrating on finishing some projects. See you soon!

Thursday, January 10, 2013

WIP Update

Whew. Between work, caring for a sick boyfriend, cleaning up after said boyfriend, and working near obsessively on my sweater, I haven't had time for anything else. Knitting time hasn't even been that much either because of it all. Such is life, right?

Cora WIP

All I have to share this week is my progress on my sweater and the little progress I have made on my Woodland Sampler. That is my project for the leftover time I have on my dinner break, so 20-30 minutes most work days. It's slow going but that's ok as it fills some dead time I may have otherwise.

Woodland Sampler WIP

I do have an idea for my first Project Quilting project. With Chad being sick, it's been more challenging to sew. I am determined to get to it tomorrow night if he is feeling better, otherwise work on it feverishly Friday night and all day Saturday.

The last new thing this week here is a running tally of books I read/listen to. I used to eat up books, sometimes reading hundreds and hundreds a year. This was before I started sewing, knitting, and doing all the other things that take up my free time. Last year I read one or two books from cover to cover. So this year, I am setting a goal of reading six and listening to fifty. I plan to listen while I knit so the latter goal should be an easy one to meet.

Hope your week is treating you well!